Working cycle | Method | |||||||
- Surfaces hydro-scarification through very high water pressure (2000 bar) with relative equipment set on a truck and automatic recovery system (roadway is left perfectly clean); | - Cleaning and/or
protection of roadway pavement and of existent horizontal and vertical
road signs; |
|||||||
- Application of a suitable primer for concrete surfaces; | ||||||||
- Application of two or three coats of varnish to choose between the cycles (see section "Paintings); | ||||||||
- Residues transportation to landfill and relative disposal; | ||||||||
When select this cycle | TECHNICAL NOTE After hydro- scarification activity, the surface treated will appear irregular. In order to obtain a perfectly smooth surface (the optimum for every painting cycle), it is necessary to study a “shaving” cycle for the concrete to be realized with cement mortar. |
|||||||
- Continuous
painting and ordinary maintenance cycles realized in the tunnels lead to
paint detachment, as a consequence of the varnish films applied in the
course of time. It is esteemed that with one painting cycle per year, these phenomenon will appear after 10-15 years. In these cases the total removal of existing paints allows to restart with standard maintenance cycles; |
||||||||
When avoid this cycle | ||||||||
Articles & Analysis (only Italian) | ||||||||
Strade &
Autostrade
n.84 - 6 Novembre/Dicembre 2010 "La preparazione delle superfici" |
||||||||
Images | ||||||||
|
||||||||
Asphalt roughening | ||||||||
Working cycle | Method | |||||||
When select this cycle | NOTA |
|||||||
When avoid this cycle | ||||||||
Articles & Analysis (only Italian) | ||||||||
Images | ||||||||
Home page | Social | |||
Services | ||||
Contact us | ||||
Brochure | ||||